Used Self Erect Cranes Temecula - The tower crane's base is generally bolted to a large concrete pad which provides really crucial support. The base is connected to a tower or a mast and stabilizes the crane which is attached to the inside of the building's structure. Normally, this attachment point is to a concrete lift or to an elevator shaft.
The mast of the crane is often a triangulated lattice structure which measures 10 feet square or 0.9m2. Attached to the very top of the mast is the slewing unit. The slewing unit consists of a motor and a gear that enable the crane to rotate.
Tower cranes may have a max unsupported height of eighty meters or two hundred sixty five feet, while the tower crane's maximum lifting capacity is 16,642 kilograms or thirty nine thousand six hundred ninety pounds with counter weights of 20 tons. Additionally, two limit switches are utilized in order to ensure the driver does not overload the crane. There is also one more safety feature called a load moment switch to make certain that the driver does not surpass the ton meter load rating. Last of all, the tower crane has a maximum reach of seventy meters or 230 feet.
There is definitely a science involved with erecting a tower crane, specially because of their extreme heights. At first, the stationary structure needs to be transported to the construction location by utilizing a big tractor-trailer rig setup. Then, a mobile crane is used so as to assemble the machine portion of the jib and the crane. These sections are then attached to the mast. The mobile crane next adds counterweights. Forklifts and crawler cranes can be some of the other industrial machinery which is used to erect a crane.
As the building is erected, mast extensions are added to the crane. This is how the crane's height is able to match the building's height. The crane crew uses what is called a top climber or a climbing frame that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. When complete, the slewing unit is able to detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an additional 20 feet or 6.1m. After that, the operator of the crane uses the crane to insert and bolt into position one more mast section piece.
Self Erect Cranes PDF